2024
Quail Creek Ave Paving Extension - Phase 1
Work: Construct approximately 650 LF Curb & Gutter, 1532 SY Reinforced Concrete Pavement, 335 SY Sidewalk 3 SWS Inlets, 237 LF SWS Pipe, and related appurtenances on the west side of S Kansas Avenue in Newton.
Closes: 11:00 a.m. December 17, 2024
NDV Plaza - Waterline Extension
Work: Construct approximately 1153 LF of 8" waterline, 3 Fire Hydrant Assemblies, and related appurtenances on S Kansas Avenue in Newton.
Closes: 11:00 a.m. October 15, 2024
Spencer Road Reconstruction - SE 14th to E 1st Street
Work: Reconstruction of approximately 22,394 SY of pavement on Spencer Road from SE 14th St. to E 1st St. in Newton.
Closes: 1:30 p.m. October 1, 2024
Compensation & Classification Study
Work: Analyze the existing classification system and develop suitable, industry-recognized classification specifications; conduct a market study, evaluate compensation adjustments, and develop cost estimates for implementation.
Closes: 5 p.m. Sept. 27, 2024
Police Training Facility
Work: Reconstruction of the existing building at 214 E. 6th St., Newton, KS, for use by the Newton Police Department as a training facility.
Closes: 11 a.m. July 11, 2024
Annual Overlay Program 2024
Work: Approximately 11,224 SY of asphalt milling and overlay of 1,523 tons of asphaltic concrete in the southern portion of Newton for the base bid plus add alternates for two parking lots as well as SE 14th St.
Closes: 11 a.m. April 18, 2024
1st and Spencer Traffic Signal
Work: Improvements of the intersection of 1st Street and Spencer Road including traffic signals, 162 SY subgrade, 268 LF curb & gutter, 81 SY concrete pavement, 58 SY concrete sidewalk, and related appurtenances.
Closes: 11 a.m. March 7, 2024
Proposal for Fischer Field Artificial Turf
Work: Proposal for removal of existing turf, regrading of subgrade, repair of drainage system, supplying and replacement of new artificial turf.
Closes: 4 p.m. February 22, 2024
Country Club Lift Station Rehabilitation
Work: Rehabilitation of the existing country club lift station including full replacement of the pumps and piping, lining of the existing wet well, new generator, and site improvements along Country Club Drive in Newton, KS.
Closes: 11 a.m. February 22, 2024
Cow Palace Road Sanitary Sewer Extension
Work: Approximately 1,700 LF 12” Sanitary Sewer Pipe, 8 sanitary sewer manholes, and related appurtenances along Cow Palace Road in Newton, KS.Closes: 11 a.m. January 18, 2024
Proposal for Construction of Park Maintenance Building
Work: Proposal for construction of the Park Maintenance Building which includes an enclosed 60' x 90' metal building with concrete footings and concrete slab, as specified.
Closes: 12 p.m. January 26, 2024
2023
Work: Approximately 12,482 LF Curb & Gutter, 20,856 SY Asphalt Concrete Pavement, 27 ADA ramps, 57,688 SF Sidewalk, 24 Stormwater Sewer Inlets, 3363 LF Stormwater Sewer Pipe, 6354 LF 8” Waterline pipe, 13 fire hydrants, and related appurtenances.
Closes: 11 a.m. December 21, 2023
Sanitary Sewer and Waterline Improvements along Washington Road
Work: Approximately 144 LF 8” Sanitary Sewer Pipe and 711 LF Waterline Pipe and related appurtenances along Washington Road in Newton, KS.
Closes: 11 a.m. December 21, 2023
Survey of Historic Resources in Downtown District
Work: Conduct a new and intensive updated survey of the C-3/Central Business district of the City of Newton along with the following as required by the State Historic Preservation Office (SHPO): Project Report, Survey Information, Images, Site Plan and meetings with the SHPO to review work. At least 250 properties would be included in this survey.
Closes: 5 p.m. December 1, 2023
2023 CCLIP Mill and Overlay of K-15 Highway (REBID2 October 2023)
Work: Approximately 21,805 SY milling, 1,932 tons asphalt pavement, 505 LF curb & gutter, sidewalk, and related appurtenances on K-15 from BNSF railroad right-of-way to NE 11th Street.
Closes: 11 a.m. October 31, 2023
Southwest 24th Street Bridge Repairs Project
Work: Approximately 115 SY of Partial Depth and 268 SY of Full Depth concrete patching on the bridge deck of the SW 24th Street Bridge over Sand Creek in Newton, KS.
Closes: 11:30 a.m. November 7, 2023
Request for Qualifications for Realtor Services
Work: Provide comprehensive real estate services, which may include assisting with listings and marketing, conducting valuations and analysis, negotiating property transactions, advising on real estate trends, and working with economic development staff to identify properties for redevelopment. Among the properties for listing is a 72-acre parcel at Newton City/County Airport.
Closes: 5 p.m. October 31, 2023
2023 CCLIP Mill and Overlay of K-15 Highway (September 2023)
Work: Approximately 33,221 SY milling, 2,943 tons asphalt pavement, 702 LF curb & gutter, sidewalk and related appurtenances on K-15 from BNSF railroad right-of-way to NE 11th Street, and from NE 13th Street to North City Limits.
Closes: 11 a.m. October 12, 2023
SE 4th Street Box Culvert & Street Improvements
Work: One Reinforced Box Culvert, 1,627 SY Pavement, 1,533 SF Concrete Driveway, 1211 LF Combined Curb & Gutter, 2,218 SF Sidewalk Concrete, 9 Sidewalk ADA curb ramps, 3 Sanitary Manhole Rehabilitation, 66 LF Chain Link Fence, 2 Curb inlets, 68 LF storm sewer, 617 LF Waterline, and related appurtenances along SE 4th Street from S. Walnut Street to S. Kansas Avenue.
Closes: 11 a.m. August 1, 2023
Old Industrial Park Brome Grass Ground Lease
Lease: The City of Newton is seeking bids for lease of Brome Hay Ground for 2023. The lease consists of 8.84 acres in the Newton Area Industrial Park.
Closes: 10 a.m. July 24, 2023
2023 CCLIP Mill and Overlay of K-15 Highway
Work: Approximately 34,752 SY milling, 3,079 tons asphalt pavement, 702 LF curb & gutter, sidewalk and related appurtenances on K-15 from BNSF railroad right-of-way to NE 11th Street, NE 13th Street to North City Limits, and on NW 12th Street from the East side of Sand Creek Bridge to K-15.
Closes: 2:30 p.m. July 20, 2023
Sanitary Sewer Extension for Fox Ridge Addition
Work: Construct approximately 7477 LF of 8" sanitary sewer pipe with 38 manholes and related appurtenances in the new Fox Ridge Addition at the former location of the Fox Ridge Golf Course.
Closes: 11 a.m. July 11, 2023
Annual Overlay Program 2023
Work: Approximately 17,446 SY of asphalt milling and overlay of 1,897 tons of asphaltic concrete in the northern portion of Newton, on 12th Street and on Kansas Ave.
Closes: 2 p.m. May 25, 2023